About Town 12/30/18

This week’s photos from around Columbia
(Click/tap on photos for larger, clearer images.)
 In training

The Soldier of Light (S.O.L.) Tactical Security Team was in training around town yesterday along with security dog Lucky.
Here’s their contact info.

Garage doors – Rated XXXXXXXXXXX
 Something happened.
[Submitted photo: Howard Stevens]

 View from inside the police station lobby

 The Good Book – good and wet

 Raindrop hanging on

 River Park in the fog

 Burning Bridge at night

Get ready for more road destruction. This time on Route 462 (the 400 block of Chestnut)

 Here are the machineries of destruction, monopolizing the parking spaces since last week.

 Jesus and his flock at Laurel Hill

 Is it done?

Work continues on the sinkhole at 3rd and Linden.

 Here’s a night view.

 Sign down across from Royer’s

 Time keeper at NAWCC

 Folks still aren’t getting it.

 Read the sign.
Nope, not OK

 View from the high school hill

 Town history and the town itself

 Kinderhook and Cloverton

 Church windows at 6th and Chestnut

 Already?
(Taxes have been in the news a lot lately.)
 Missing pieces

 What’s happening here?

 Over on Grinnell Avenue

 Going down Plane Street

 At the tunnel

 Fox43 at the shooting scene this past week

 Tide Pride

 This used to be the Alley Cat, among other things.

 Sidewalk conversation

 Back deck at the Legion
 A door within a door

Coal chute door 
Patriotic display
Close-up of our mural
(What happened to the rest of the mural anyway?)

0 thoughts on “About Town 12/30/18”

  1. That is a penn dot sign on 462, but that brings up why our council is putting street lites on a state road?? MORE FARTS TO COME FROM THE 7 with no sense I am shore.

    Like

  2. I heard they added a new piece of equipment that required PPL to increase the size of their service cable powering the Cafe and apartments. The lady at the Cafe said Don Murphy immediately rented a large generator to get her back up and running. I don’t know anyone who would do that for their tenant. Murphy’s are awesome and that building looks amazing!

    Like

  3. “they added a new piece of equipment that required PPL to increase the size of their service cable powering the Cafe and apartments” ? Didn't anyone think about what they were doing beforehand? Didn't an electrician check this out before the equipment was added?

    Like

  4. The sign MAYBE part of the signal permit. If in fact it is part of the signal permit it is to be maintained by the Borough. All traffic signals are the responsibility of the municipality they are in regardless if they are on a state road or not. The borough has a copy of the permit and it will show if that sign is part of the permit that was issued to them.

    Like

  5. Hum shouldn't you have the electric service in place before you get new equipment, the know if you buy 3 phase machines, this seams to be a person that made a mistake and puts blame on something else.

    Like

  6. That is a penn dot sign on 462, but that brings up why our council is putting street lites on a state road?? MORE FARTS TO COME FROM THE 7 with no sense I am shore.

    Like

  7. I heard they added a new piece of equipment that required PPL to increase the size of their service cable powering the Cafe and apartments. The lady at the Cafe said Don Murphy immediately rented a large generator to get her back up and running. I don’t know anyone who would do that for their tenant. Murphy’s are awesome and that building looks amazing!

    Like

  8. “they added a new piece of equipment that required PPL to increase the size of their service cable powering the Cafe and apartments” ? Didn't anyone think about what they were doing beforehand? Didn't an electrician check this out before the equipment was added?

    Like

  9. The sign MAYBE part of the signal permit. If in fact it is part of the signal permit it is to be maintained by the Borough. All traffic signals are the responsibility of the municipality they are in regardless if they are on a state road or not. The borough has a copy of the permit and it will show if that sign is part of the permit that was issued to them.

    Like

  10. Hum shouldn't you have the electric service in place before you get new equipment, the know if you buy 3 phase machines, this seams to be a person that made a mistake and puts blame on something else.

    Like

Leave a comment